The work that has happened in the unit over the past two days is astonishing. The first floor is loaded with the dry wall, metal supports, and duct work that has been removed from the downstairs. Thanks to the removal of the duct work we now have a basement with almost 8 foot high ceilings!
We also took down walls and removed a doorway at the botton of the stairs, which will make the whole space not only more open and attractive, but also more useful.
